This is a system of erection in which the bottom plates are completed. The top course is erected on the bottom plates, the roof framing and sheeting are completed and a number of jacks are then assembled around the structure. By means of jacks the completed top course together with the roof framing and sheeting is lifted to a height sufficient to insert the next lower course. The final operation is the welding of the lower shell to the bottom plates.